Client
AWG Donau-Wald mbH
Location
Außernzell landfill (landfill class II in the Deggendorf district)
Project scope
- Recompaction of two landfills owned by the operator. Uncontrolled subsidence of the landfill bodies was prevented by eliminating the cavities.
- Installation materials: Asbestos cement waste, artificial mineral fibres (MMMF refuse), mineral and other road construction waste.
- Goal: Improved stability and higher compaction density to prolong the lifetime of the landfill.
- Test operation of the BOMAG BW 226 DI-5 single drum roller on two test sites in the Außernzell landfill. The results were confirmed by identical tests on the Passau-Hellersberg landfill site (class I).
Project date
15 October 2019: Field trial, Außernzell landfill