Project data:

  • Single-layer bearing course installation with AC 32 TS
  • Bitumen: 50/70
  • Mat height: 14 cm
  • Length of construction: . 400 m
  • Output per day: 500 t


Compaction requirements:

  • Half side paving approx. 3.60 m
  • 1 x BW 161 ADO-5 AM (9.6 t)
  • 1 x BW 174 AP (10 t-class)
  • Number of passes:
    4 x vibration
    2 - 4 x static (ironing)
  • Rolling speed: 4-6 km/h


The typical application of a roller with tangential oscillation is not only limited to thin layers or low vibration compaction work on bridges or in the vicinity of housings.

In connection with its powerful vibration (front drum) the roller is suitable for a wide range of applications. The deep reaching vibration (possibly with high amplitude) and the oscillation near the surface result in positive synergies.

Result: Much quicker homogeneous compaction progress right from the beginning - even more important if unfavourable weather conditions cause the mix to cool down much quicker.
 
No matter whether thick bearing courses or thin surface layers: BW 161 ADO-5 with wide range of applications. No matter whether thick bearing courses or thin surface layers:
BW 161 ADO-5 with wide range of applications.
BW 161 ADO-5 in edge compression application: With good vision all works out well.BW 161 ADO-5 in edge compression application:
With good vision all works out well.
     

 

Basic rehabilitation of the A 48 highway as an asphalt construction, Germany

Project data:

  • Base c: AC 32 TS
  • Two layers (16 to 18 cm)
  • Bitumen: 50/70
  • Total area: 70.000 m²
  • Total production: ca. 30.000 t
  • Production/day: 4.200 t max.


Compaction requirement and compaction:

  • Density: 97%
  • Pre-compaction of base course with two rubber tired rollers, BW 24 RH (ca. 14 t)
    No. of passes: 4
  • Tire pressure:  ca. 6 bar
  • Working speed: 3-5 km/h
  • Post-compaction (ironing) with 4 tandem rollers BW 174 AD-AM (10 t oper. weight)
    No. of passes: 6
  • Working speed: 4-6 km/h

 
 

 

Six-lane construction of highway A1, Germany

Project data:

  • Base course: AC 32 TS
  • Two layer pavement 
  • Base course material was laid continuously up to a screed width of 7,50 m and with the help of a shuttle buggy
  • Bitumen: 50/70
  • Thickness: 2x11 cm
  • Production/day: 1.800 t


Compaction requirement and compaction:

  • Compaction requirement: 97%
  • Major compaction task: 2 Tandem rollers BW 174 AD-AM II  and BW 174 AD-AM  (10 t operating weight)
  • No. of passes:  6 
  • Working speed: 4 km/h
  • Static compaction (ironing)
  • BW 184 AD-AM (13 t operating weight)
  • 1x Tandem roller (10 t)
  • No. of passes: 4-6
  • Working speed: 6 km/h

 
 

 

© 1997 - 2017 BOMAG GmbH. All rights reserved.