Dam construction rockfill dam

Zletovica Project, Macedonia

Project data:

  • Length: 350 m
  • Height: 80 m
  • Total volume: 2.5 Mio. m³ rockfill
  • Maximum bolder size: 400 mm 

Compaction requirement and compaction:

  • Compaction requirement: 2.14 t/m³
  • Lift thickness: 600 mm
  • Compaction with BW 219 DH-4 at 6 passes, v = 2,5 km/h
  • Compaction trial by water replacement method. 

 
 


Shui Bu Ya rockfill dam, China

Project data:

  • Length: 610 m³
  • Height: 223 m
  • Total volume: 15 Mio. m³ rockfill; blasted lime stone
  • Maximum bolder size: 600 mm 

Compaction requirement and compaction:

  • Compaction requirement: 2,15 t/m³
  • Lift thickness: 800-1.000 mm
  • Compaction with BW 225 DH-BVC (VARIOCONTROL) at 8 passes, v = 2-2,5 km/h